The Resource Early estimation of project determinants : predictions through establishing the basis of new building projects in Germany, von Onur Dursun

Early estimation of project determinants : predictions through establishing the basis of new building projects in Germany, von Onur Dursun

Label
Early estimation of project determinants : predictions through establishing the basis of new building projects in Germany
Title
Early estimation of project determinants
Title remainder
predictions through establishing the basis of new building projects in Germany
Statement of responsibility
von Onur Dursun
Creator
Author
Subject
Language
eng
Summary
The study initiated with underlying principles of construction production which is an impetus to ill-conditioned prediction of project determinants at the early phases of building projects. To enhance the precision of these estimations, unique solutions relying on the statistical evidences were offered
Member of
Cataloging source
E7B
Dewey number
692.50943
Illustrations
illustrations
Index
no index present
LC call number
NA2542.4
LC item number
.D877 2014eb
Literary form
non fiction
Nature of contents
  • dictionaries
  • bibliography
Series statement
Schriftenreihe Bauökonomie
Label
Early estimation of project determinants : predictions through establishing the basis of new building projects in Germany, von Onur Dursun
Publication
Copyright
Bibliography note
Includes bibliographical references
http://library.link/vocab/branchCode
  • net
Carrier category
online resource
Carrier category code
cr
Carrier MARC source
rdacarrier
Color
multicolored
Content category
text
Content type code
txt
Content type MARC source
rdacontent
Contents
  • Table of Contents; List of Abbreviations; List of Figures; List of Tables; Abstract; Zusammenfassung; 1 Introduction; 1.1 Research Background; 1.2 Problem Statement; 1.3 Scope, Aims, and Hypotheses; 1.4 Structure of the Manuscript; 2 Literature Review; 2.1 Construction Cost Estimation; 2.2 Construction Duration Estimation; 3 Methodology; 3.1 The Empirical Work; 3.2 Linear regression; 3.3 Artificial Neural Networks; 3.4 Concluding Remarks; 4 Sample; 4.1 Overview; 4.2 Restrictions and Predictor Variables; 4.3 Response Variables; 4.4 Supporting the Hypotheses -- Pilot Analysis
  • 4.5 Concluding Remarks5 Results of Analysis; 5.1 Reference Unit Quantities; 5.2 Cost of Structure; 5.3 Construction Duration; 6 Comparison of the Frameworks; 6.1 Cost Estimation Frameworks; 6.2 Duration Estimation Frameworks; 7 Implementation; 7.1 Story of 1300-082; 7.2 Point Estimates; 7.3 Confidence Intervals; 8 Conclusions; References
Control code
ocn903959810
Dimensions
unknown
Extent
1 online resource (154 pages)
Form of item
online
Isbn
9783110347876
Media category
computer
Media MARC source
rdamedia
Media type code
c
Other physical details
illustrations, tables
http://library.link/vocab/recordID
.b34180825
Specific material designation
remote
System control number
  • (OCoLC)903959810
  • pebcs3110347873

Library Locations

    • Deakin University Library - Geelong Waurn Ponds CampusBorrow it
      75 Pigdons Road, Waurn Ponds, Victoria, 3216, AU
      -38.195656 144.304955
Processing Feedback ...