The Resource On the minimum makespan machine scheduling problem with sequence dependent setups and due dates, Andreas Ernst and Vicky Mak

On the minimum makespan machine scheduling problem with sequence dependent setups and due dates, Andreas Ernst and Vicky Mak

Label
On the minimum makespan machine scheduling problem with sequence dependent setups and due dates
Title
On the minimum makespan machine scheduling problem with sequence dependent setups and due dates
Statement of responsibility
Andreas Ernst and Vicky Mak
Creator
Contributor
Subject
Language
eng
Cataloging source
VDU
Dewey number
519.77
Index
no index present
Literary form
non fiction
Nature of contents
bibliography
Series statement
Technical reports. Mathematics series (Deakin University. School of Information Technology)
Series volume
TR M05/01
Label
On the minimum makespan machine scheduling problem with sequence dependent setups and due dates, Andreas Ernst and Vicky Mak
Publication
Note
"22 July, 2005."
Bibliography note
Includes bibliographical references (p. 20-22)
http://library.link/vocab/branchCode
  • zbnus
  • glg
  • adl
Control code
000040196040
Dimensions
30 cm
Extent
22 p.
http://library.link/vocab/recordID
.b21401172
System control number
  • 21401172dm
  • (OCoLC)225037960

Library Locations

    • Deakin University Library - Geelong Waterfront CampusBorrow it
      1 Gheringhap Street, Geelong, Victoria, 3220, AU
      -38.143069 144.360403
    • Deakin University Library - Geelong Waurn Ponds CampusBorrow it
      75 Pigdons Road, Waurn Ponds, Victoria, 3216, AU
      -38.195656 144.304955
    • Deakin University Library - Geelong Waurn Ponds CampusBorrow it
      75 Pigdons Road, Waurn Ponds, Victoria, 3216, AU
      -38.195656 144.304955
Processing Feedback ...